Wire Rope Hoist NOVA – Power House Hydroelectric Power Plant – 1×50t
In a hydroelectric power plant, a powerful NOVA rope hoist is used for lifting and positioning a large-volume unit in the powerhouse. The hoist plays a central role in the assembly, inspection, and maintenance of vertical turbines and generators, which are among the heaviest components of such a facility.
The hydroelectric industry places particularly high demands on precision, load capacity, and operational safety – especially in confined spaces and sensitive technical infrastructure. The rope hoist with a special girder allows for controlled, symmetrical lifting of such components without the risk of damage to bearings, housings, or shafts. Even during extended downtimes, the equipment remains reliably ready for use – a crucial advantage for operators who rely on long plant lifetimes.
This lifting solution ensures high work safety, efficient maintenance processes, and significantly contributes to plant availability and supply security in the field of renewable energy.
ELECTRIC WIRE ROPE HOIST
NOVA1 rope
NOVA1 rope is designed for loads up to 80 t. The wire rope hoists feature optimal space utilization and maximum efficiency. NOVA1 rope is extremely flexible and easy to adapt to the individual requirements of your customers.
Intelligent monitoring and optimized control
Conveniently expand NOVA1 rope with electronic monitoring and control features (Crane Intelligence) to optimize monitoring processes.
Optimal use of space
Compact design, minimal hook dimensions, best approach dimensions available on the market
Low maintenance costs
Lifetime brake, rope drum with an extra-large diameter for minimal rope wear, lifetime lubricated hoist gear, smooth cross traveling controlled by a frequency inverter for less wear and tear
Safe, precise operation
Minimal lateral hook movement, low load swing and smooth load movements controlled by frequency inverters
Customized crane solutions

Wire Rope Hoist NOVA – Maintenance of Coal Power Plant – 1×6.3t

Wire Rope Hoist NOVA – Contactor Controlled Sluice Gate – 2x30t

Winch CRABster – Turbine Hall Hydroelectric Power Plant – 1x130t

Winch CRABster – Turbine Hall Hydroelectric Power Plant – 1x105t

Hand Chain Block CRAFTster – Turbine Hall Hydroelectric Power Plant – 1×3,5t

Winch CRABster – Turbine Hall Hydroelectric Power Plant– 1x150t

Wire Rope Hoist NOVA – Contactor Controlled Sluice Gate – 8x16t

Manual Chain Hoist CRAFTster – Power Plant Maintenance – 3×2t

Wire Rope Hoist NOVA – Outdoor Weir – 1×18t

Winch CRABster – Turbine Hall Hydroelectric Power Plant – 1x300t

Wire Rope Hoist NOVAex – ATEX Zone Energy/Process Technology – 1×13t

Wire Rope Hoist NOVA – Bulkhead Dam – 1x15t

Wire Rope Hoist NOVA² rope – Maintenance in Wastewater Treatment Plant – 1x4t

Chain Hoist – Maintenance of Fine Screen Systems – 1x2t

Wire Rope Hoist NOVA – Wind Power Manufacturing – 6×5t
Find your crane


Describe your needs and get a solution proposal.
SWF Krantechnik GmbH
Boehringerstr. 4
D-68307 Mannheim
Phone +49 621 78990-0
Fax +49 621 78990-100
info.de@swfkrantechnik.com
www.swfkrantechnik.com
Our Office Hours
Mon – Fri: 8.00-17.00 CET